Copper Powder Metallurgy Sintered flanged bronze bushings assortment sleeve Oil bronze pipe bush brass face bushing

FOB Reference Price:Get Latest Price
US $0.03-20 / Pieces | 500 Piece/Pieces (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Zhejiang, China (Mainland)
Brand Name:
Maosheng
Model Number:
Oil bronze bushing
Type:
Sleeve ; Flange ; Sphercial
Material:
Brass
Product name:
bronze bushing
Feature:
Sintering
Oil Impregnated Rate::
15%-25%
Material Composition::
CuSn6Zn6Pb3,Cu90Sn10,CuSn6Zn6Pb0,Fe,Cu-Fe
Gravity&Density::
6.4-7.6g/cm3
Graphite Content Rate::
1%-3% Max
Hardness HB-bronze::
30-70 Bronze
Hardness HB-iron::
35-145 Iron
Supply Ability
Supply Ability:
2000000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
packed by cartons
Port
NINGBo
Lead Time :
Within 20-25days After Order Confirmation

 

Copper Powder Metallurgy Sintered flanged bronze bushings assortment sleeve Oil bronze pipe bush brass face bushing

 

 

Q1. What is your terms of payment?                                                                            

A:Usually,we accept T/T,irrevocable L/C at sight.For regular orders,we prefer 30% in advance,70% against the  copy of B/L.For long term business relations, we have more advantage terms for payment.

 

Q2. What is your terms of delivery?                                                                             

A: We accept FOB,CIF,etc. You can choose the one which is the most convenient or cost effective for you.

 

Q3: What is the lead time?                                                                                             

A:It usually takes 25 to 35 days after sample confirmation and receiving your advance payment. The specific delivery time depends on the items and the quantity of your order. If the item was non standard, we have to consider extra 10-15days for tooling/mould made.

 

Q4: How about tooling Charge?                                                                                    

A: Tooling charge only charge once when first order, all future orders would not charge again even tooling repair or under maintance.

 

Q5. What is your sintered metal parts sample policy?                                                      

A: We are glad to send sintered metal parts samples for your inspection.Standard samples can be free, but the clients need to cover the freight cost.

 

Q6. Can you produce according to the samples or drawings?                                  

A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

 

Q7: How to confirm the quality with us before starting to produce?                        

1) We can provide samples and you can  choose one or more, and then we make the quality according to that. 2) Send us your samples, and we will make it according to your quality.

 

Q8: How to solve the quality problems after sales?                                                   

A: Take photos of the problems and send to us. We will make a satisfied solution for you within three days after we  confirm the problems.

 

Q9. What is your terms of packing?                                                                              

A: Generally, we pack our goods in neutral cartons. If you have legally registered patent,  we can pack the goods by your logo after getting your authorization letters.

 

Q10. Do you test all your goods before delivery?                                                      

A: Yes, we have 100% test before delivery. We have QC team comply with TQM,each step is in compliance tothe  standards.